1 delicate installation of 2 bar screens on a WWTP
We recently installed two XG12 automatic vertical bar screens at a WWTP in the PACA region, after removing existing competing equipment.
This turnkey project was particularly challenging in view of the cramped conditions (cramped premises, existing piping nearby, difficult access, etc.), during which we were able to demonstrate our full range of skills. Starting with the measurements taken by our sales representative, the feasibility study, the specific design of the bar screen frames and finally the installation of the proposed equipment.
From dismantling the existing equipment to starting up the new one, it took us three days for each bar screen. A great success considering the complexity of the project.
TECHNICAL DATA
Supply of 2 automatic vertical bar screens
- Type XG12
- ALL STAINLESS STEEL 304L
- Maximum throughput 800m3/h per bar screen
- 6mm air gap
- Unit width 1000mm
- Depth under countertop 1500mm
- 3-part chassis (max. length 1500mm)
Options retained
- FB Procédés electrical box mounted on the side of each bar screen
- Manual emergency grille, 10mm air gap
- Transport of ordered equipment
- Dismantling existing equipment
- Assembly of new equipment
- Testing, adjustment and training of operating personnel