4 vertical bar screens on a pumping station

Jun 20, 2022

Last week, our technicians Cédric and Geoffrey (accompanied by our local sales manager Stéphanie) were on a Spanish island to install 4 XG12 automatic vertical bar screens at a pumping station.

One of the special features of this site is the depth of the channels, 11,300mm, with a unit width of 1,500mm. Each undercarriage is made up of three sections, assembled vertically as they are placed in the channels.

Between the fixings for the guide rails, the installation frames, the side deflectors at the grilles, the reinforcements and the weir sills, this represents almost 700 dowels installed.

Our intervention lasted 3 days. We'll be back in September for electrical connections, commissioning and operator training.

We sincerely thank our customer for his confidence.

TECHNICAL DATA

Supply of 4 vertical bar screens of the XG12

  • ALL STAINLESS STEEL 316L
  • Maximum flow per line 8500m3/h
  • Air gap 20mm, Grille height 3000mm
  • Unit width 1470mm
  • Depth below surface 11300mm
  • 4-part bar screen frame

Options retained

  • 2 electrical control panels for 2 bar screens each
  • Variable-speed operation for optimized cycle times
  • Supply of weirs to be placed downstream of each bar screen
  • Transport of all equipment from our workshops in the Nantes suburbs to Southern Europe
  • Installation of the 4 bar screens by two FB Procédés technicians