INSTALLATION

Our automatic bar screens can be installed in existing or new structures, adapting perfectly to civil engineering. As a designer and manufacturer, we can meet all your installation requirements.

Contact Us

Visit Bar Screens FB Procédés can be adapted to new or existing civil engineering. Their vertical design allows a wide range of installation configurations, whether in channels, circular or straight stations.

Each bar screen is designed to adapt perfectly to civil engineering, taking all constraints into account. There are an infinite number of possible configurations, but here we present the most common ones.

Operation of an Automatic Bar Screen in a channel

dégrilleur dans un canal

Visit automatic bar screen is installed across the effluent, with upstream or downstream discharge depending on the model.

Depending on flow rate and technical specifications, the bar screen can either be the same width as the channel, or narrower, in which case a side deflector is installed.

Visit bar screen is fixed in two places:

  • at the bottom of the upper section, on top of the channel walls, using chemical dowels
  • in the lower part, at the level of the approach receptacle, on the channel walls using mechanical pegs

For installation in existing civil engineering, whether for a first-time installation or as a replacement for an existing one. bar screen existing Bar Screens FB Procédés are designed to adapt perfectly to existing civil engineering, thus avoiding any modification of the latter.

dégrilleur en poste droit
degrilleur en canal
Dégrilleur en canal

Automatic Bar Screen in straight or circular station

dégrilleur dans un poste de relèvement

Visit Bar Screens The main advantage of FB Procédés vertical machines is that they take up very little space. This characteristic makes our vertical bar screens the best solution for installation in a straight or circular post.

Visit straight or circular bar screen is custom-designed according to the water depth and substation diameter. Visit bar screen is then simply applied to the station wall.

This configuration minimizes the space taken up by the bar screenThis is particularly useful for a lift station, where the pumps can be accessed easily and safely.

The bar screen is attached in two places:

  • at the bottom of the upper part, on top of the substation, by chemical anchoring
  • mechanically anchored to the substation wall at the bottom
dégrilleur en poste droit
dégrilleur en poste traitement des eaux usées
dégrilleur à poste ou circulaire