A beautiful installation in Catalonia
Just before the festive season, our technicians replaced two competing bar screens at a wastewater treatment plant on the outskirts of Barcelona.
In collaboration with the customer, we have considerably optimized the operating conditions of the bar screens. In fact, the supply of an access footbridge means that it is possible to walk all around the bar screens, and thus carry out all maintenance operations in complete safety.
Waste from the bar screens is evacuated and compacted to a skip located on one side of the manhole, via a conveying screw and a compacting screw.
A fine reference that took us a week to assemble, from unloading the truck to starting up and testing the equipment.
TECHNICAL DATA
Supply of 2 automatic bar screens
- Type NG11
- ALL STAINLESS STEEL 304L
- Flow to be treated by bar screen 2000m3/h
- 20mm air gap
- Depth under countertop 4400mm
- 3-part chassis
- Side deflectors Height 2500mm
- Center bow Ht. 2500mm
Supply of 2 screws
- 1 VTP250 & 1 VCP250
- ALL STAINLESS STEEL 304L
- Conveyor screw type VTP, length 6500mm
- Compacting screw type VCP, length 3000mm
Options retained
- 1 access walkway, 5200x2500mm, ALL STAINLESS STEEL 304L, with staircase, guardrail and non-slip flooring
- 1 FB Procédés control unit for 2 bar screens and 2 screws
- Assembly by FB Procédés technical teams
- Transport from our workshops in Nantes to the site near Barcelona